This second SWUCA Five-Year Assessment has found that the District and its partners have achieved further progress toward:
- Continuing to meet the water supply needs of the region for all use categories;
- Achieving further reductions in overall groundwater use from the Upper Floridan aquifer to address the Saltwater Intrusion Minimum Aquifer Level in the MIA; and
- Achieving minimum flows in the Upper Peace River via the completed Lake Hancock Lake Level Modification Project.
Despite success in the above areas, challenges still remain in achieving the minimum levels in lakes along the Ridge Lakes area.